Boatbuilding Blog

December 7, 2009

Handrails and Windows

Filed under: Hardware — tomlarkin @ 12:20 pm

I’ve got 5 windows and most of the handrails installed. I ran out of brass handrail tubing, so I now have an excuse to go to Alaskan Copper again!  One of my favorite road trips.

 

Some windows installed. It’s already warmer inside with my small space heater. You can see the aft-cabin handrail I put on yesterday.
Port stern quarter view

These are vertical handrails installed inside and outside, through-bolted to each other.  The inside tubing isn’t installed yet in this picture.  The fittings are from New Found Metals.
Handrails 

Windows, handrails, and the vents over the Dorade box openings.
Windows, handrails, and vents

The front center window opens.  The cowl vents open to the internal Dorade box.
Bow window

Advertisements

1 Comment »

  1. thenk you and your famlly .
    you are a good men
    algeria

    Comment by fouad — December 13, 2009 @ 8:35 am


RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: